NIR CONSTRUCTION PROJECT BACKGROUND
Since 2006 through 2014
No. |
Project Name |
Location |
Owner |
Description of Works & Contract Deadline |
1 |
Kashagan Onshore Experimental Project |
Karabatan |
Second Kazakhstan Branch of «GATE Insaat Taahhut Sanayi ve Ticaret A.S.»
|
Precast Fabrication Works at Temporary Facilities (reinforced concrete manholes, trays, assemblies, elements and etc.) 2006-2008 |
2 |
City Mall, multiplex cinema building |
Aktobe |
KMA Stroy Service LLP |
Cinema Building Project including all concrete & steel structure works 2008-2009 |
3 |
“Bolashak” Business Center Construction |
Astana |
MM Proje Ins. ve Dan. Hizm. Tic. Lim. Sti. |
Ceramic tiling and plastering works 2008 |
4 |
«ESSENTAY» Project |
Almaty/Atyrau |
Almaty Branch of «ENKA Insaat ve Sanayi A.S.» |
Assembly and Dismantling of Modular Buildings (reinforced concrete , scaffolding, finishing, electrical, ceramic works) 2008-2009 |
5 |
River Port Reconstruction Project |
Atyrau
|
West oil LLP |
Steel frame modular office building, Dismantling and further assembly by “TURN KEY” 2009 |
6 |
River Port Reconstruction Project |
Atyrau |
«Treysan Prefabrik Celik Yapilar Sanayi ve Ticaret A.S.» Branch company |
Modular steel structured hangar building. Assembly of modular building by “TURN KEY” 2009 |
7 |
River Port Reconstruction Project |
Atyrau |
«Atyrau Multi-Service LTD» LLP |
Construction of concrete road pavement, production of reinforced concrete manholes, trays, curbs, drainage holes, foundation blocks 2009 |
8 |
Office and Rotation Camp of CCC |
Karabatan |
«Treysan Prefabric Celik Yapillar Sanayi ve Ticaret A.S.» Branch company |
Assembly of modular dormitories for engineers and labors by “TURN KEY” 2009 |
9 |
Worker Dormitories in the vicinity of Atyrau Airport |
Atyrau |
ARTCON LTD. |
Various construction work package 2009 |
10 |
Reconstruction of river port |
Atyrau |
«Consortium «ISKER»» LLP Zhuravlev V.M. |
Construction and mounting of modular buildings (including construction of concrete trays for heating system) 2009 |
11 |
Office and Rotation Camp of CCC |
Karabatan |
«Consolidated Contracting, Engineering & Procurement S.A.L., Offshore» Organization Gazi Anouti |
Mounting of tented hangars 2009 |
12 |
Waste Assimilation Base |
Atyrau |
«WEST DALA» LLP Salakhedenov K.Sh. |
Concrete Work Package (concrete foundation mats, curbs) 2009 |
13 |
«ADK» City Mall |
Almaty |
«AMF 1 - Imsalkon» LLP |
Various concrete works (concrete slabs, foundations, mats, molding) 2010-2011 |
14 |
USKO Almaty Logistics Center |
Almaty |
“USKO Logistics Int.” |
Construction of concrete foundations, columns, reservoirs |
15 |
Rotation Camp |
Atyrau / Karabatan |
«Yalan-Atyrau Ltd» LLP |
Erection of modular dormitories for 264 man by TURN-KEY 2011 |
16 |
Swimming Pool and Recreation Center |
Caspian wharf «ERSAI», Mangistau reg., Kuryk v. |
«КМА Stroy Sevice» LLP |
Concrete Works, Erection of Steel Structures and Modular Building by TURN-KEY 2010-2012 |
17 |
Project of Almaty logistic center USKO |
Almaty reg., Talgar area, Kainar rural district, Zhanalyk |
«Samsung Engineering Kazakhstan» LLP |
Concrete Work Package (such as construction of concrete foundations, columns, reservoirs) 2010-2011 |
18 |
Kashagan Experimental Program Onshore Plant Construction Works |
Karabatan |
The Kazakhstan Branch II «GATE Insaat Taahhut Sanayi ve Ticaret A.S.» |
Dismantling and packaging of steel structures 2011-2012 |
19 |
Rotation Camp |
Atyrau / Karabatan |
«Yalan-Atyrau Ltd» LLP |
“TURN KEY” Erection of modular buildings 1680 m2 2012 |
20 |
Rotation Camp |
Atyrau Rotation Camp “Tengiz” |
«Denholm Zholdas» LLP |
“TURN KEY” Construction of Entire Rotation Camp (Modular buildings) 6800 m2 2012-2013 |
21 |
«Royal Plaza» Multifunctional Entertaining Center |
Almaty reg., Kapshagay |
«КМА Stroy Sevice» LLP |
Concrete Work Package (including construction of concrete fire, boiler and pump station reservoirs) 2013 |
22 |
Kashagan Experimental Program Onshore Plant Construction Works |
Karabatan |
The Kazakhstan Branch II «GATE Insaat Taahhut Sanayi ve Ticaret A.S.» |
Erection of Steel Structured Hangar, Workshop and Warehouse Buildings, Prefabricated Office building assembly 2012 |
23 |
KAKHMYS Aktogay Copper Plant Project |
East Kazakhstan, Ayagoz region, Aktogay |
«Treysan Prefabric Celik Yapillar Sanayi ve Ticaret A.S.» Branch company |
Construction of camp TURN-KEY, 46 modular building, 6 steel structured building assembly, total area 25000 m2 2013 |
24 |
KAKHMYS Aktogay Copper Plant Project |
East Kazakhstan, Ayagoz region, Aktogay |
“Alsim Alarko Sanayi Tesisleri ve Ticaret A.S.” Ekibastuz Branch |
Prefabricated modular building assembly 2013 |
25 |
KAKHMYS Aktogay Copper Plant Project |
East Kazakhstan, Bozshakol |
«Treysan Prefabric Celik Yapillar Sanayi ve Ticaret A.S.» Branch company |
Worker Dormitory Assembly 2013 |
26 |
Office and Sport Center Building Construction |
Atyrau |
«КМА Stroy Sevice» LLP |
All concrete and brick works 2013 - active |
27 |
“KENTECH” Rotation Camp |
Atyrau / Tengiz |
«Treysan Prefabric Celik Yapillar Sanayi ve Ticaret A.S.» Branch company |
Modular Office Building TURN-KEY Assembly 2013 |
28 |
“KENTECH” Rotation Camp |
Atyrau / Tengiz |
«Treysan Prefabric Celik Yapillar Sanayi ve Ticaret A.S.» Branch company |
Hangar Building Assembly 2013 |
29 |
“SICIM s.P.a.” Rotation Camp |
Atyrau / Tengiz |
«Treysan Prefabric Celik Yapillar Sanayi ve Ticaret A.S.» Branch company |
Modular Worker Dormitory & Canteen Buildings Assembly 2013 - active |
30 |
Almaty-Ust Kamenogorsk Road Reconstruction |
Almaty |
“Dogus Gulsan” JV |
Reinforced Concrete Foundation Works for temporary buildings and structures |
31 |
Almaty-Ust Kamenogorsk Road Reconstruction |
Almaty |
“Dogus Gulsan” JV |
Fencing Works |
32 |
Almaty-Ust Kamenogorsk Road Reconstruction |
Almaty |
“Dogus Gulsan” JV |
TURN-KEY Camp Assembly Works |